Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Buxton Power Limited

29 unique locations (195 components) - Page 1 of 3

Tunstead Quarry, Waterswallows Road Tunstead House, Buxton, SK17 8TG (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Tunstead Quarry (2), Waterswallows Road Tunstead House, Buxton, SK17 8TG (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
SPENCER ROAD BUXTON DERBYSHIRE SK17 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
POOL WATFORD ROAD BUXTON DERBYSHIRE SK17 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
MEAD CLOSE BUXTON NORWICH NORFOLK NR10 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
MACCLESFIELD OLD ROAD BUXTON DERBYSHIRE SK17 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
LISMORE ROAD BUXTON DERBYSHIRE SK17 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
LEVEL LANE BUXTON DERBYSHIRE SK17 (5 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
Loading map...
Showing 10 locations