Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

2408 unique locations (57912 components) - Page 94 of 97

Active MW: 260.05 MW
Inactive MW: 13.73 MW
B68 (12 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
3.52 MW
B67 (3 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-1)
B66 (8 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
3.52 MW
B65 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.52 MW
B64 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.38 MW
B63 (22 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.59 MW
B62 (21 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.48 MW
B61 (32 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.38 MW
B60 (37 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
19.46 MW
B6 (4 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1)
7.39 MW
B50 (16 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.59 MW
B5 (2 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4)
4.48 MW
B49 (16 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.53 MW
B48 (5 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.59 MW
B47 (11 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.48 MW
B46 (15 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.38 MW
B45 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
11.86 MW
B44 (11 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.48 MW
B43 (8 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3.52 MW
B42 (12 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4)
14.97 MW
B38 (4 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
3.57 MW
B37 (17 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.48 MW
B36 (19 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
14.98 MW
B35 (2 components)

Domestic EV charger

Active • 2024-25 (T-4)
34.80 MW
B34 (8 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4)
11.86 MW
Loading map...
Showing 25 locations