Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

1393 unique locations (46473 components) - Page 1 of 56

Active MW: 260.05 MW
Inactive MW: 13.73 MW
YO8 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
14.98 MW
YO61 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.38 MW
YO43 (15 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2024-25 (T-1), 2024-25 (T-4) ...
22.57 MW
YO42 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
3.55 MW
YO41 (28 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.39 MW
YO31 (17 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4) ...
14.98 MW
YO30 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.38 MW
YO26 (43 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
3.57 MW
YO25 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
38.32 MW
YO24 (27 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.59 MW
YO23 (27 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.39 MW
YO21 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.39 MW
YO19 (37 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
19.46 MW
YO15 (17 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.03 MW
WV8 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
12.07 MW
WV6 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
19.46 MW
WV4 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.48 MW
WV3 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
3.55 MW
WV16 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
22.60 MW
WV14 (16 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.59 MW
WV12 (17 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.59 MW
WV11 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.48 MW
WV10 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.39 MW
WV1 (3 components)

Domestic EV charger

Active • 2024-25 (T-4), 2025-26 (T-4)
0.03 MW
WS7 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
4.48 MW
Loading map...
Showing 25 locations