Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ALKANE ENERGY UK LIMITED

116 unique locations (657 components) - Page 1 of 5

Active MW: 282.24 MW
Inactive MW: 661.92 MW
Aberdeen Garthdee Rd Rp - Aberdeen and Angus AB10 7AY (1 component)

Commercial sites

Active • 2024-25 (T-1)
6.78 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2022-23 (T-1), 2023-24 (T-1) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2024-25 (T-1), 2025-26 (T-1) ...
Aylesbury - West Herts HP20 1ST (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.31 MW
Basingstoke Chineham Sc - Hampshire and South Downs RG24 8BQ (1 component)

Commercial sites

Active • 2024-25 (T-1)
6.78 MW
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (25 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (6 components)

Battery storage

Inactive • 2018-19 (T-1), 2021-22 (T-4)
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (6 components)

1x 1.55MW Containerised Generating sets.

Inactive • 2016-17 (TR)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (7 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2019-20 (T-1), 2022-23 (T-3) ...
Bilsthorpe Colliery Site,Bilsthorpe, Newark, Notts, NG22 8ST (5 components)

MWM TCG 2020 x 2 1 x CAT 3520

Inactive • 2017-18 (T-1)
Bletchley Beacon Rp - Northants and Bucks MK1 1BN (1 component)

Commercial sites

Active • 2024-25 (T-1)
3.25 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (5 components)

Solar PV generation site

Active • 2024-25 (T-1), 2025-26 (T-1) ...
Bristol Avon Meads Rp - Bristol BS2 0SP (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.92 MW
Bristol Emerson Green - Bristol BS16 7AE (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.18 MW
Chichester North St - Portsmouth and Worthing PO19 1LB (1 component)

Commercial sites

Active • 2024-25 (T-1)
21.03 MW
Cocknage Road, Stoke on Trent, Staffordshire, ST3 4AW (5 components)

1 x MWM TCG 2020

Inactive • 2017-18 (T-1)
1.75 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2018-19 (T-1), 2021-22 (T-4) ...
Loading map...
Showing 25 locations