Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ALKANE ENERGY UK LIMITED

129 unique locations (670 components) - Page 5 of 6

Active MW: 282.24 MW
Inactive MW: 661.92 MW
Florence Energy Park, Cocknage Road, Stoke on Trent Staffordshire ST3 4AE (7 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Active • 2023-24 (T-4), 2022-23 (T-3) ...
East Kilbride Kingsgt Rp - South Lanarkshire G74 4UN (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.57 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.75 MW
Cocknage Road, Stoke on Trent, Staffordshire, ST3 4AW (5 components)

1 x MWM TCG 2020

Active • 2017-18 (T-1)
Chichester North St - Portsmouth and Worthing PO19 1LB (1 component)

Commercial sites

Active • 2024-25 (T-1)
21.03 MW
Bristol Emerson Green - Bristol BS16 7AE (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.18 MW
Bristol Avon Meads Rp - Bristol BS2 0SP (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.92 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (5 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-1) ...
Bletchley Beacon Rp - Northants and Bucks MK1 1BN (1 component)

Commercial sites

Active • 2024-25 (T-1)
3.25 MW
Bilsthorpe Colliery Site,Bilsthorpe, Newark, Notts, NG22 8ST (5 components)

MWM TCG 2020 x 2 1 x CAT 3520

Active • 2017-18 (T-1)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (7 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (6 components)

1x 1.55MW Containerised Generating sets.

Active • 2016-17 (TR)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (6 components)

Battery storage

Active • 2021-22 (T-4), 2018-19 (T-1)
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (25 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Basingstoke Chineham Sc - Hampshire and South Downs RG24 8BQ (1 component)

Commercial sites

Active • 2024-25 (T-1)
6.78 MW
Aylesbury - West Herts HP20 1ST (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.31 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2025-26 (T-1) ...
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations