Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ADD Renewables Limited

12 unique locations (153 components) - Page 1 of 2

Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
SHENLEY GROUNDS WB, WHADDON ROAD CALVERTON, MK19 6EU (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (34 components)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2623.32 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (12 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.09 MW
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (28 components)

Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
DUSTON MILL-PITSFORD WA, DUSTON MILL RIVER INTAKE, NN5 6ER (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Bond Avenue Bletchley Milton Keynes MK1 1JJ (18 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.88 MW
Loading map...
Showing 10 locations