ADD Renewables Limited

2 unique locations (13 components)

Land to the west of Old Forge Dr, Redditch B98 7SY, UK (4 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW