Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ZEPHYRUS GREEN ENERGY LTD

3 unique locations (7 components)

Active MW: 0.00 MW
Inactive MW: 0.62 MW
WOODBURY CLOSE CALLOW HILL REDDITCH WORCESTERSHIRE B97 (3 components)
• 4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.
• Domestic EV charger
• Stoke on Trent. 1426886500002. Four reciprocating engines 1.7MW and one of 1.6MW capacity.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.62 MW
Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN (2 components)

4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
MARSHALL ROAD LICHFIELD STAFFORDSHIRE WS13 (2 components)
• 4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load. The auxiliary load for Drax Power Station is measured by 2 BMUs: E_MDRX001 and E_MDRX002. E_MDRX001 is an aggregation of meters S.T.1A: S.T.1B: S.T.2A: S.T.2B. E_MDRX002 is an aggregation of the FGD Transformers shown on the diagram as 3 4 5&6. The auxiliary load will be apportioned equally between the 6 main units at Drax Power Station therefore this component should take 1/6th of this imported power away from it’s gross net generation to give net output.
Active • 2028-29 (T-4), 2018-19 (T-4)
0.53 MW
Loading map...
Showing 3 locations