Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ZENOBE RENTAL 12 LIMITED

11 unique locations (158 components)

Active MW: 769.87 MW
Inactive MW: 334.88 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (14 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Bus depot site
• Load reduction on site supported by non-exporting standby generation.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.34 MW
44-48 E Dock St, Dundee DD1 3JS (9 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.33 MW
East One Building, Danes Way DIRFT Logistics Park, NN6 7GX, Northampshire (21 components)
• 5 MW of demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is a single CHP unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (4 components)
• 1.500MW Demand reduction at Coventry Bus Depot
• EV charging at residential premises
• The CMU is a coal-fired set in the Uskmouth power station. This is one of the 2 active units.
Active • 2026-27 (T-4), 2021-22 (T-1) ...
Larkfield Industrial Estate, 99 Earnhill Road, Greenock, PA16 0EQ (5 components)
• 1.9 MW Gas gen ENER-G 1999
• bus depot
Active • 2026-27 (T-4), 2023-24 (T-1) ...
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sloper Rd, Cardiff CF11 8TB (9 components)
• Bus depot site
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
• bus depot site
Active • 2026-27 (T-4), 2024-25 (T-1) ...
1.42 MW
Stagecoach Guildford, Peasmarsh, Guildford, GU3 1LZ (12 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Genset 2
• New build battery
Active • 2026-27 (T-4), 2023-24 (T-1) ...
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
The Limes, Midland Rd, Hugglescote, Coalville LE67 2FX (6 components)
• Bus depot site
• New build electricity storage facility, comprising of 20MW batteries, transformers, control room and associated switchgear in a secure fenced compound.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
Yardley Wood Bus Depot, Yardley Wood Rd, Yardley Wood, Birmingham, B14 4BN (14 components)
• 0.52 MW Battery Storage located at National Express Yardley Wood.
• 0.52MW Battery Storage located at National Express Yardley Wood
• 5 MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 11 locations