Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ZENOBE RENTAL 12 LIMITED

8 unique locations (177 components)

Active MW: 592.24 MW
Inactive MW: 512.51 MW
4 Finway Road Hemel Hempstead HP2 7PT (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (9 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
East One Building, Danes Way DIRFT Logistics Park, NN6 7GX, Northampshire (19 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (28 components)
• Peterhead 1
• Peterhead CCGT
• Peterhead CCGT for Delivery Year 2018/19 only
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (15 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Salvesen Way, Industrial Estate, Brighton St, Hull, HU3 4XN United Kingdom (27 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (31 components)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 8 locations