Waterswallows Energy Limited
218 unique locations (1500 components) - Page 9 of 9
Braunton Road Ashford Barnstaple Devon EX31 4BR (5 components)
Water treatment centre
Braunton Road Ashford Barnstaple Devon EX31 4BR (1 component)
Water treatment centre
BLACK WATER DRIVE WIMBORNE DORSET BH21 (12 components)
EV charging at residential premises
Bath CHP, Midland Road, Bath, BA2 3EW (12 components)
A gas engine CHP site providing hot water to a local district heating network
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (12 components)
A gas engine CHP site providing hot water to a local district heating network
BARN WATER LANE RADWINTER SAFFRON WALDEN CB10 (12 components)
EV charging at residential premises
BARN WATER LANE DENSTON NEWMARKET SUFFOLK CB8 (10 components)
EV charging at residential premises
Asda Chorley Ringway, Water Street , Chorley, PR7 1EX (10 components)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (1 component)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (7 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (2 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Alex Waters Crescent Falkirk Stirlingshire FK2 (11 components)
EV charging at residential premises (3)
AL6 (51 components)
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (12 components)
A gas engine CHP site providing hot water to a local district heating network (3)
47-53 Charterhouse Street, London, EC1M 6PB (28 components)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)