Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Waterswallows Energy Limited

220 unique locations (1506 components) - Page 8 of 9

Active MW: 14.00 MW
Inactive MW: 27.16 MW
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
WATER PUMP STATION, HIGH ROAD, ASHTON KEYNES, SWINDON, SN6 6NX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1)
14.00 MW
WATERS EDGE ANDERTON NORTHWICH CHESHIRE CW9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
WATERS EDGE BOGNOR REGIS WEST SUSSEX PO21 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
28.00 MW
Waters Edge Close, Whitehaven, Cumbria, CA28 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
14.00 MW
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
WATER SQUARE ASHBURNHAM DRIVE CUCKFIELD HAYWARDS HEATH WEST SUSSEX RH17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
Water Street Bristol Avon BS40 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
WATER STREET BURNTWOOD STAFFORDSHIRE WS7 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
Water Street , Chorley, PR7 1EX (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Waterswallows Road Buxton Derbyshire SK17 7JB (21 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115MW Diesel and/or gas dual fuel reciprocating engine
• 2.115mw diesel and/or gas dual fuel reciprocating engine
• ... and 2 more unique descriptions
Inactive • 2018-19 (T-1)
Waterswallows Road Buxton Derbyshire SK17 UK (21 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115MW Diesel and/or gas dual fuel reciprocating engine
• 2.115mw diesel and/or gas dual fuel reciprocating engine
• ... and 2 more unique descriptions
Inactive • 2017-18 (T-1)
WATERS WAY M28 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
WATERS WINSTON ROAD GAINFORD DARLINGTON DL2 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
WATER TREATMENT WORKS, WARKWORTH, MORPETH, NE65 0UB (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
WATER TREATMENT WORKS, WESSEX WATER LIMI, SUTTON BINGHAM, YEOVIL, SOMERSET, BA22 9QL (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
WELLINGTON AVENUE VIRGINIA WATER (JAA) GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.00 MW
WELLINGTON AVENUE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.00 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations