Waterswallows Energy Limited

27 unique locations (279 components) - Page 1 of 3

WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Viking Link Ltd, Bicker Fen Converter Station, Northorpe Road, Donington SPALDING PE11 4XY (2 components)
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
• Viking Link is a HVDC interconnector between GB and Danish transmission systems. Viking Link involved the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity is converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2028-29 (T-4), 2027-28 (T-4)
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (7 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (5 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-4) ...
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (7 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (7 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.38 MW
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (10 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (17 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.30 MW
Loading map...
Showing 10 locations