Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Waterswallows Energy Limited

35 unique locations (345 components) - Page 2 of 4

Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (5 components)

Water source heat pumps at 1748kW each (2)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.45 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (7 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (7 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.38 MW
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (9 components)

A gas engine CHP site providing hot water to an industrial unit

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.79 MW
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (10 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (17 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.30 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.80 MW
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (8 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Loading map...
Showing 10 locations