Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Waterswallows Energy Limited

18 unique locations (101 components) - Page 1 of 2

Braunton Road Ashford Barnstaple Devon EX31 4BR (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Chenhalls Road St Erth Hale Cornwall TR27 6LA (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Chingford South Raw Water PS, Lea Valley Road, Enfield, London, United Kingdom, E4 7PX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Christchurch Bournemouth BH23 2JY (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (27 components)
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
Active • 2028-29 (T-4), 2026-27 (T-4) ...
90.66 MW
Datchet 2 Raw Water PS, Horton Road, Datchet, Slough, United Kingdom, SL3 9HX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (5 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.13 MW
Francis Avenue Bournemouth BH11 8NX (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• Load curtailment at site
• Load curtailment at site with standby generation exporting
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Loading map...
Showing 10 locations