Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Waterswallows Energy Limited

18 unique locations (101 components) - Page 1 of 2

Wimbourne Bournemouth BH21 5EP (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Staines Raw Water PS, Birch Green, , Staines, United Kingdom, TW18 4HA (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• Water source Heat Pumps at 1748KW each
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (3 components)

A gas engine CHP site providing hot water to agricultural greenhouses

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (9 components)

A gas engine CHP site providing hot water to an industrial unit

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.58 MW
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• Load curtailment at site
• Load curtailment at site with standby generation exporting
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations