WALKER & SON (HAULIERS) LIMITED

8 unique locations (33 components)

Active MW: 33.46 MW
Inactive MW: 365.17 MW
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (9 components)
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Industrial Pallets, 1 Kirkhaw Lane, Ferrybridge, Knottingley, WF11 8RD (2 components)
• A 20MW new build gas generating station..
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Land 15, J3 Business Park, Carr Hill, Balby, Doncaster, DN4 5JT (4 components)

A new build gas fuelled generating station.

Inactive • 2019-20 (T-1)
Land at Caxton Way, Dinnington, Rotherham, S25 3QE. (3 components)
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
• a new build gas generating station
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Multi-Tech Engineering (UK) Ltd, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire, WF11 8RD (4 components)
• A 20MW new build gas generating station..
• DSR Component providing load turn down at a retail store
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Plot A3, Watervole Way, Doncaster, DN4 5JP (5 components)
• 25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions certification and using Gas-To-Liquids (GTL) fuels/lubricants and fitted with Exhaust Gas Treatments (EGT) incorporating Selective Catalytic Reduction (SCR), Diesel Particulate Filter (DPF) and Diesel Oxidation Catalyst (DOC) systems with ?ad-blue?)
• A 20MW new build gas generating station..
• A new build gas generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Snape Lane, Doncaster, DN11 8RU (5 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

A 20MW new build gas generating station..

Inactive • 2022-23 (T-3)