WHITETOWER ENERGY LIMITED

13 unique locations (92 components) - Page 1 of 2

A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (5 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (13 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
149.89 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
127.07 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (4 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Factory Lane Croydon Surrey CR0 3LE (1 component)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2022-23 (T-4)
Factory Lane, Croydon, Surrey, CR0 3LE (5 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Factory Lane Croydon Surrey CR0 3RL (7 components)

Existing OCGT.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
131.30 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Fort Parkway, Heartlands, Birmingham, B24 9QT (7 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (5 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...