WEST BURTON B LIMITED

5 unique locations (40 components)

Active MW: 2649.26 MW
Inactive MW: 8748.85 MW
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Solenis UK Industries Limited, Cleckheaton Road, Low Moor, Bradford, West Yorkshire, BD12 0JZ (10 components)
• CHP Tornado SGT-200 6.4MWh
• CHP Typhoon SGT-100 4.7MWh
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (4 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)