Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

WATSON HEAD WIND FARM LIMITED

8 unique locations (106 components)

Active MW: 0.69 MW
Inactive MW: 0.00 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (11 components)
• Battery storage
• Battery strorage unit
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x Wind Turbine Generating Unit

Active • 2026-27 (T-4), 2023-24 (T-1)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (4 components)
• 1 x 4.2MW Onshore Wind Turbine Generator
• 1 x Wind Turbine Generating Unit
Inactive • 2023-24 (T-1)
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• Battery Storage
• Gas reciprocating engines
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 8 locations