Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

WALKER & SON (HAULIERS) LIMITED

5 unique locations (35 components)

Active MW: 33.46 MW
Inactive MW: 365.17 MW
Snape Lane, Doncaster, DN11 8RU (5 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Plot A3, Watervole Way, Doncaster, DN4 5JP (5 components)
• 25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions certification and using Gas-To-Liquids (GTL) fuels/lubricants and fitted with Exhaust Gas Treatments (EGT) incorporating Selective Catalytic Reduction (SCR), Diesel Particulate Filter (DPF) and Diesel Oxidation Catalyst (DOC) systems with ?ad-blue?)
• A 20MW new build gas generating station..
• A new build gas generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Land 15, J3 Business Park, Carr Hill, Balby, Doncaster, DN4 5JT (4 components)

A new build gas fuelled generating station.

Inactive • 2019-20 (T-1)
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (9 components)
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (12 components)
• A new build gas fuelled generating station.
• EV charging at residential premises
Active • 2026-27 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 5 locations