Valencia Waste Management Limited

9 unique locations (27 components)

Active MW: 0.00 MW
Inactive MW: 115.37 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (2 components)

The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (2 components)

The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (4 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in Oxwell mains near Dunbar.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (6 components)
• 10 MW power plant comprising 5 x 2MW gas fired reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Beddington ERF, 105 Beddington Lane, Croydon, CR0 4TE (3 components)

Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.

Inactive • 2019-20 (T-1)
Loading map...
Showing 9 locations