VITAL ENERGI SOLUTIONS LIMITED

19 unique locations (270 components)

Active MW: 37.18 MW
Inactive MW: 75.69 MW
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 ORF (4 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Combined Cycle Gas Turbine
Active • 2024-25 (T-4), 2017-18 (T-1)
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
• 800kW/ 1100kWh BYD Lithium Ion Battery
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Drakelow Energy Generation Facility, Walton Road, Burton upon Trent, DE15 9UA (1 component)

VIT301 - 18MW Steam Turbine at Drakelow Energy Generation Facility, Walton Road, Burton upon Trent, DE15 9UA

Active • 2024-25 (T-4)
Energy Centre, Lower Mosley Street, Manchester M2 3GX (12 components)
• A 3.36MW gas fired reciprocating engine CHP.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ (1 component)

19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in …

Inactive • 2022-23 (T-4)
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (12 components)
• 4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (12 components)
• N/A
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (47 components)
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-19' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-19) and TG1B and Unit 3 (which make up EMD-19). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (9 components)
• A gas turbine installed at Aberdeen Royal Infirmary
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Imperial College London, South Kensington Campus, SW7 2AZ (30 components)
• A 4.5MW gas fired reciprocating engine CHP (Engine 1).
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
• CMU consisting of a gas reciprocating engine and alternator
Active • 2026-27 (T-4), 2025-26 (T-4) ...
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Ketton Works, Ketton, Stamford, PE9 3SX (5 components)

Onsite demand reduction and load shifting at cement works

Inactive • 2021-22 (T-4), 2020-21 (T-1)
Ninewells Hospital, Dundee, DD2 1UB (10 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Wind Turbine Generators x 15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Slepe Farm Solar, Seven Acres Field, Slepe Farm, Slepe, Nr Poole, Dorset, BH16 6HS (4 components)
• 1 x 250kW/250kWh Lithium Ion Battery
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
Active • 2025-26 (T-4), 2020-21 (T-4) ...
South Kensington Campus, London, SW7 2AZ (6 components)
• One of two, 4.5MW CHP engines at Imperial Collage London
• One of two, 4.5MW CHP engines located at Imperial College London
Inactive • 2022-23 (T-4), 2019-20 (T-1)
The Power House Commercial Road Wolverhampton WV1 3QS (4 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (7 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...