VIRIDOR ENERGY LIMITED

7 unique locations (62 components)

Active MW: 184.49 MW
Inactive MW: 238.46 MW
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (11 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive •
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (6 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in Oxwell mains near Dunbar.
Inactive •
Exeter ERF, Grace Road South, Exeter EX2 8QE (17 components)
• Energy from Waste Facility located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4.5 MW subject to calorific value of waste and biogenic content
Inactive •
Grace Road South, Exeter, EX2 8QE (7 components)

Energy from Waste Facility which exports at between 3MW and 3.5MW subject to calorific value of waste and biogenic content.

Inactive •
Trident Park EfW, Glass Avenue, Cardiff, CF24 5JQ (8 components)

CARerf is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although is currently constrained by a grid connection of 31.43MW (at export meter point).

Inactive •
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (12 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Active • 2022-23 (T-3), 2022-23 (T-4) ...