VIRIDOR ENERGY LIMITED

7 unique locations (31 components)

Active MW: 70.31 MW
Inactive MW: 352.63 MW
Trident Park EfW, Glass Avenue, Cardiff, CF24 5JQ (6 components)

CARerf is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although is currently constrained by a grid connection of 31.43MW (at export meter point).

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Newlands Road, Wentloog Corporate Industrial Park, Cardiff, CF3 2EU (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Land at Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire,ST5 9JA (4 components)

New reciprocating gensets in acoustic building/enclosure

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Houghton Main Colliery Park Spring Road Little Houghton Barnsley S71 5EX (1 component)

Energy from Waste facility

Inactive • 2021-22 (T-4)
Grace Road South, Exeter, EX2 8QE (7 components)

Energy from Waste Facility which exports at between 3MW and 3.5MW subject to calorific value of waste and biogenic content.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (4 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in Oxwell mains near Dunbar.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (8 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...