Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

VALENCE POWER LIMITED

4 unique locations (189 components)

Active MW: 0.00 MW
Inactive MW: 113.13 MW
Land at Ernest Nunn Road, Stowmarket IP14 2AH (6 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Active • 2019-20 (T-1), 2018-19 (T-1)
GREBE COTTAGE BURLINGTON POOL SHIFNAL SHROPSHIRE TF11 (2 components)
• CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. Dobson Park, WN2 2DY SD600050
Inactive • 2019-20 (T-4), 2018-19 (T-1)
CH62 (54 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL5 (127 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Loading map...
Showing 4 locations