Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

URBAN RESERVE (ASSETCO) LIMITED

7 unique locations (77 components)

Active MW: 180.04 MW
Inactive MW: 294.45 MW
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (20 components)
• A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (16 components)
• A gas engine CHP site providing hot water to an industrial unit
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land at Union Street, Masbrough, Rotherham S61 1AA Rotherham (10 components)
• 10 MW Storage facility located at Cheadle.
• CMU consisting of multiple reciprocating engines and alternators
• Reciprocating genset in acoustic enclosure
Active • 2024-25 (T-4), 2022-23 (T-3) ...
LAND AT NEWOPAUL WAY WARMINSTER BUSINESS PARK BATH ROAD WARMINSTER WILTSHIRE BA12 8RY CH65 4EF (4 components)
• CMU consisting of a gas reciprocating engine and alternator
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Unit 3 at Saltend Power Station
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
LAND AT HEATH BUSINESS PARK GRANGE WAY COLCHESTER ESSEX CO2 8GU (10 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of a gas reciprocating engine and an alternator
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 7 locations