Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

URBAN RESERVE (ASSETCO) LIMITED

133 unique locations (981 components) - Page 1 of 6

Active MW: 180.04 MW
Inactive MW: 294.45 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
• Component has yet to be procured.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
62 Marlborough Road Lancing Business Park Lancing BN15 8UF (5 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2022-23 (T-1)
7 COWLEY WAY CREWE CW1 6AE (3 components)

CMU consisting of multiple gas reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
7 COWLEY WAY CREWE CW1 6AE (4 components)

CMU consisting of multiple gas reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
ASDA Distribution Centre, Galleon Blvd, Dartford, DA2 6QA (13 components)
• CMU consisting of multiple reciprocating engines and alternators
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Ellesmere Port, Grange Road CH65 0BZ (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• battery energy storage system
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Auchteraw Farm, Fort Augustus, PH32 4BT (5 components)
• CMU consisting of a gas reciprocating engine and alternator
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2025-26 (T-1), 2023-24 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
• 800kW/ 1100kWh BYD Lithium Ion Battery
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Bowlers Croft, Basildon, SS14 3HH (2 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2022-23 (T-1)
CLAYDON BUSINESS PARK GIPPING ROAD GREAT BLAKENHAM IPSWICH IP6 0NL (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
Cottam Development Centre Power Station Cottam Retford DN22 0TF (6 components)
• CHP on a hospital site
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Development Centre (CDC) CCGT single unit station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Cottam EDF Energy (Cottam Power) Ltd, Outgang Lane, Cottam, Retford, DN22 0NP (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Crosby Power, Church Street, Bootle, L20 1AF (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• N/A
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF (10 components)
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (33 components)
• EV charge station
• Heysham 1 Power Station CMU 1: [HY1124] T_HEYM11
• Heysham 1 Power Station CMU 2: [HY1224] T_HEYM12
Active • 2028-29 (T-4), 2026-27 (T-4) ...
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (4 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (5 components)

CMU consisting of multiple gas reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations