URBAN RESERVE (ASSETCO) LIMITED

7 unique locations (99 components)

Active MW: 184.02 MW
Inactive MW: 290.47 MW
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (9 components)
• 4MW of DSR
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (23 components)
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Cargill PLC, Trafford Park, M17 1PA (24 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2025-26 (T-4) ...
Broad Lane, Harts Hill (Wasing Estate) Generation, Thatcham, Newbury, RG7 6SX (5 components)
• CHP Engine 3.360MW
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
• gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
9 Handyside St, Kings Cross, London N1C 4BH (16 components)
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
• Gas fired reciprocating engines.
Active • 2027-28 (T-4), 2024-25 (T-4) ...