URBAN RESERVE (ASSETCO) LIMITED

13 unique locations (115 components)

Active MW: 180.04 MW
Inactive MW: 294.45 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Gas reciprocating engines.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (20 components)
• A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Orchardbank Business Park, Forfar, Angus, Dundee, Scotland, DD8 1WG (5 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Existing OCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
LAND ON BREDBURY WAY STOCKPORT SK6 2TF (6 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Connah's Quay PS Unit 3 CCGT
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land at Union Street, Masbrough, Rotherham S61 1AA Rotherham (10 components)
• 10 MW Storage facility located at Cheadle.
• CMU consisting of multiple reciprocating engines and alternators
• Reciprocating genset in acoustic enclosure
Active • 2024-25 (T-4), 2022-23 (T-3) ...
LAND AT NEWOPAUL WAY WARMINSTER BUSINESS PARK BATH ROAD WARMINSTER WILTSHIRE BA12 8RY CH65 4EF (4 components)
• CMU consisting of a gas reciprocating engine and alternator
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Unit 3 at Saltend Power Station
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
LAND AT HEATH BUSINESS PARK GRANGE WAY COLCHESTER ESSEX CO2 8GU (10 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of a gas reciprocating engine and an alternator
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD TORQUAY TQ2 8JG (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2021-22 (T-4), 2020-21 (T-1)
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (25 components)
• CMU consisting of multiple reciprocating engines and alternators
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Cottam EDF Energy (Cottam Power) Ltd, Outgang Lane, Cottam, Retford, DN22 0NP (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...