UNIPER GLOBAL COMMODITIES SE

26 unique locations (623 components) - Page 1 of 2

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (7 components)

Enfield CCGT Power Station - (one unit station)

Active • 2027-28 (T-4), 2024-25 (T-4) ...
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
• N/A
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Challenge Way, Blackburn, Lancashire BB1 5QB (2 components)
• Connah's Quay PS Unit 4 CCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2025-26 (T-4), 2022-23 (T-3)
Cottam Development Centre Power Station Cottam Retford DN22 0TF (7 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (9 components)
• 1 x hydro turbine & synchronous generator
• EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• Enfield CCGT Power Station - (one unit station)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (5 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Single combined cycle gas turbine with supplementary firing
Active • 2024-25 (T-4), 2022-23 (T-3) ...
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
• Connah's Quay PS Unit 1 CCGT
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (4 components)
• Enfield CCGT Power Station - (one unit station)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
• Connah's Quay PS Unit 3 CCGT
• New build battery storage
• New build generating storage unit
Active • 2028-29 (T-4), 2023-24 (T-1) ...
Lunar Freezing - Fraserburgh, 46-50 Shore St, Fraserburgh AB43 9BT, UK (5 components)
• Connah's Quay PS Unit 2 CCGT
• Energy from Waste Recovery Facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Newton Aycliffe CO Durham DL5 6EA (46 components)
• N/A
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)
• Battery Storage Station
• Connah's Quay PS Unit 1 CCGT
Active • 2025-26 (T-4), 2022-23 (T-3)