UNIPER GLOBAL COMMODITIES SE

22 unique locations (763 components)

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (17 components)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Newton Aycliffe CO Durham DL5 6EA (46 components)
• N/A
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
• Connah's Quay PS Unit 1 CCGT
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (5 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Single combined cycle gas turbine with supplementary firing
Active • 2024-25 (T-4), 2022-23 (T-3) ...
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
BWW014, Cheddar T.W, Lower New Road, Cheddar, Bs27, BS27 3DY (18 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (25 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (16 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Ratcliffe Unit 4 coal-fired unit
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
ACS&T - Grimsby - Site 2, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (17 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ABP UK Shrewsbury, 1 Battlefield Rd, Shrewsbury SY1 4AH, United Kingdom (24 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Milling Motor Pelletizers, Fans etc
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• N/A
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 22 locations