Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

UNIPER GLOBAL COMMODITIES SE

15 unique locations (90 components)

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Gas Oil as specified by BS2869 Class A2
• This CMU component represents the BESS system of a co-located (solar and storage) site
Active • 2025-26 (T-1), 2020-21 (T-4)
Nile Mill, Fields New Road, Chadderton, Oldham, OL9 8PH (2 components)
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Gas Oil as specified by BS2869 Class A2
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Morton Hill Farm and land on the East side of Blyth Road, Babworth, DN22 8HE (2 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Inactive • 2020-21 (T-4)
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
Active • 2028-29 (T-4), 2020-21 (T-4)
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (12 components)
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
• Gas reciprocating engines
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (5 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Single combined cycle gas turbine with supplementary firing
Active • 2024-25 (T-4), 2022-23 (T-3) ...
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (5 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear
• A Battery Energy Storage System
• Ratcliffe Unit 1 coal-fired unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
E.ON Cottam Development Centre Power Station Cottam Retford DN22 0TF (3 components)

Cottam Development Centre (CDC) CCGT single unit station

Inactive • 2020-21 (T-4), 2017-18 (T-1)
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (2 components)
• 44MW Storage consisting of 11 x 4MW units
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
Inactive • 2022-23 (T-3), 2020-21 (T-4)
Asda Tamworth, 91 Chesterfield Rd, Lichfield WS13 6QW (3 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 15 locations