Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

UNIPER GLOBAL COMMODITIES SE

2 unique locations (14 components)

Active MW: 5016.59 MW
Inactive MW: 15970.84 MW
Unit 23B, South Gyle Crescent, Edinburgh, EH12 9EQ (2 components)
• Battery Energy Storage System
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 2 locations