Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

UK UTILITY RESERVE LIMITED

3 unique locations (30 components)

Active MW: 32538.50 MW
Inactive MW: 77828.28 MW
Alders Way, Paignton, TQ4 7QL (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Derwent Power Plant, Holme Lane, Spondon, Derby, DE21 7NT (2 components)

CMU S23DPP will be formed of multiple individual generating units controlled centrally and exporting to the distribution system

Inactive • 2023-24 (T-4)
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
• 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Link® will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
• Battery energy storage unit
• Two gas CHP in a horticultural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 3 locations