UK POWER RESERVE LIMITED

12 unique locations (109 components)

Active MW: 32538.50 MW
Inactive MW: 77828.28 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
• A gas fuelled CHP plant
• A gas fuelled Combined Heat and Power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (5 components)
• New Build 49.5 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Asda Tamworth, 91 Chesterfield Rd, Lichfield WS13 6QW (3 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Northallerton, Brompton Road , Northallerton, DL6 1DT (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)

Load reduction on flexible electricity consuming processes (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (23 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 12 locations