UK POWER RESERVE LIMITED

68 unique locations (1142 components) - Page 1 of 3

Active MW: 32538.50 MW
Inactive MW: 77828.28 MW
24a Flightway Dunkeswell Honiton EX14 4LG (2 components)
• Generating unit 3.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2020-21 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
ACS&T - Grimsby - Site 1, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (16 components)
• Hunterston B Power Station CMU 8: [HU8-19] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
• Existing OCGT
• New build power station comprised of multiple reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• load curtailment at site
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Asda Edinburgh, 100 The Jewel, Brunstane, Edinburgh, EH15 3AR (13 components)
• Existing Generation on existing site - CHP
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Asda Northallerton, Brompton Road , Northallerton, DL6 1DT (11 components)
• Load curtailment
• Load curtailment from refridgeration
• To be confirmed
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Asda Tamworth, 91 Chesterfield Rd, Lichfield WS13 6QW (3 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
• 1 MW CHP generation
• 30MW/30MWh one hour battery storage asset located near BURWB1 asset
• Siemens SGT200 based CHP
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Boundary Street, Wigan WN1 3AP (13 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Bristol Road Gloucester GL2 5YA (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
BW007, Oldford High Lift, Oldford Highlift Pumping Station, Oldford Hi Resevoir, Iron Mill Lane, BA11 2ND (18 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
BWW006, Oldford Borehole, Oldford Borehole, Lullington Lane, Frome, BA11 2NF (18 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Camilla Farm, Auchtertool, Kircaldy, Fife, KY2 5XW (3 components)
• Battery storage facility with 49.950MW interconnected capacity for both export and import
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• To be confirmed
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Fitzwise Yard Troughbrook Road Hollingwood CHESTERFIELD S43 2JP (3 components)
• 4MW of demand reduction
• CHPs at Queen Elizabeth Hospital
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2021-22 (T-4)
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• Site with behind the meter diesel generation - offsetting site load and exporting surplus.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...