UK POWER RESERVE LIMITED

17 unique locations (432 components)

Active MW: 32538.50 MW
Inactive MW: 77828.28 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
• Existing OCGT
• New build power station comprised of multiple reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• load curtailment at site
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Asda Northallerton, Brompton Road , Northallerton, DL6 1DT (11 components)
• Load curtailment
• Load curtailment from refridgeration
• To be confirmed
Active • 2028-29 (T-4), 2025-26 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• Site with behind the meter diesel generation - offsetting site load and exporting surplus.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components)
• A gas fuelled CHP plant
• A gas fuelled Combined Heat and Power plant
• Gas reciprocating engines
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
• Load reduction on site supported by non-exporting standby generation.
• The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
• West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Saltend Power Station Saltend Hull HU12 8GA (30 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• Generating Unit 1
• ROCable hydro units within the BMU are not included in the CMU.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...