UK Dynamic Reserve Limited

11 unique locations (125 components)

Active MW: 32538.50 MW
Inactive MW: 77828.28 MW
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)
• An energy from waste facility located in North Wales and designed to generate electricity
• Enfield CCGT Power Station - (one unit station)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (21 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• CMU consisting of multiple gas reciprocating engines and alternators
Active • 2028-29 (T-4), 2024-25 (T-4) ...
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Manorway, Stanford-le-Hope, Essex SS17 9LP (3 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• N/A
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
LAND AT HEATH BUSINESS PARK GRANGE WAY COLCHESTER ESSEX CO2 8GU (10 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of a gas reciprocating engine and an alternator
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT3 4PA (17 components)
• 1 x OCGT
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Gas fuelled generation plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 11 locations