UES ASSET 1 LIMITED

1 unique locations (3 components)

Active MW: 66.29 MW
Inactive MW: 0.00 MW
West Nash Road, Nash, Newport, NP18 2BZ (3 components)
β€’ A new build 115MW/230MWh 2 hour Battery Energy Storage System to be connected to the National Grid Transmission Network at 132kV located at the Uskmouth substation
β€’ A new build 115MW/230MWh battery energy storage system connected to the National Grid Transmission network at 132kV, located at Uskmouth
β€’ A new build 119.9MW/239.8MWh 2 hour Battery Energy Storage System to be connected to the National Grid Trasnmission Network at 132kV located at the Uskmouth substation.
Active β€’ 2029-30, 2026-27
66.29 MW
Loading map...