THE ISLE OF WIGHT ENERGY COMPANY LIMITED

8 unique locations (56 components)

Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (9 components)

Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Arreton Valley Nusery, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR (1 component)

The CMU component will have a connection capacity of 2.52MW. BYD Battery

Active • 2027-28 (T-4)
0.20 MW
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% … (2)
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% … (2)
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (15 components)
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Active • 2026-27 (T-4)
0.30 MW
Tees Valley Nursery, The Moat, Billingham, TS23 4ED (3 components)

Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wight Salads Arreton Newport Isle of Wight PO30 3AR (5 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Loading map...
Showing 8 locations