Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

THE ISLE OF WIGHT ENERGY COMPANY LIMITED

6 unique locations (20 components)

Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (5 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Tees Valley Nursery, The Moat, Billingham, TS23 4ED (3 components)

Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Active • 2026-27 (T-4)
0.30 MW
0.20 MW
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (9 components)

Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 6 locations