Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

TATA STEEL UK LIMITED

13 unique locations (485 components)

Active MW: 221.72 MW
Inactive MW: 315.65 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (7 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive •
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Inactive •
10.94 MW
To be confirmed - the components of the Unproven DSR CMU are to be determined. (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive •
To be confirmed - the components of the unproven DSR are to be determined (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

Inactive •
TBC but targeted at: Llanwern Works NP9 0XN OS: ST 394861 Port Talbot Works, South Wales, SA13 2NG OS: SS782870 (6 components)

Industrial Steelmaking / Manufacturing Site

TATA STEEL UK LIMITED Not Prequalified
Inactive •
TBC - as this is an unproven DSR CMU we will determine the components from the Tata Steel UK estate. (2 components)

Manufacturing process within the Tata Steel estate ( specific installations to be confirmed )

Inactive •
TBC (271 components)
• Aggregate CMU from multiple sources
• TBC
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
Inactive •
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (11 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive •
Port Talbot, Port Talbot Works, SA13 2NG (15 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive •
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (4 components)

Industrial process within the Tata Steel estate - specific installations TBC

Inactive •
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (32 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1 and TS20_1
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1, TS20_1 and TS21_1 as well as TS23_1
Inactive •
43.44 MW
Loading map...
Showing 13 locations