TATA STEEL UK LIMITED

17 unique locations (206 components) - Page 1 of 2

Active MW: 87.51 MW
Inactive MW: 449.85 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (3 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (2 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
Trostre Works Llanelli Carmarthenshire SA14 9SD (91 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.94 MW
To be confirmed - the components of the Unproven DSR CMU are to be determined. (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive • 2018-19 (T-1)
To be confirmed - the components of the unproven DSR are to be determined (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

Inactive • 2019-20 (T-1)
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (9 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (5 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Port Talbot Steelworks, Port Talbot, SA13 2NG (3 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)