Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

TATA STEEL UK LIMITED

7 unique locations (216 components)

Active MW: 221.72 MW
Inactive MW: 315.65 MW
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (32 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1 and TS20_1
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1, TS20_1 and TS21_1 as well as TS23_1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
43.44 MW
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (4 components)

Industrial process within the Tata Steel estate - specific installations TBC

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (15 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Port Talbot Steelworks, Port Talbot, SA13 2NG (3 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (10 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-4) ...
10.94 MW
Loading map...
Showing 7 locations