Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

TATA STEEL UK LIMITED

11 unique locations (55 components)

Active MW: 94.32 MW
Inactive MW: 443.05 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (3 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (2 components)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
To be confirmed - the components of the Unproven DSR CMU are to be determined. (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive • 2018-19 (T-1)
To be confirmed - the components of the unproven DSR are to be determined (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

Inactive • 2019-20 (T-1)
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (9 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (5 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Port Talbot Steelworks, Port Talbot, SA13 2NG (3 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (14 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (4 components)

Industrial process within the Tata Steel estate - specific installations TBC

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Components will be derived from multiple manufacturing locations & assets within TSUK. To be confirmed after initial prequalification. (3 components)

Industrial Manufacturing Site with multiple processes. Energy demand management plans already in place.

Inactive • 2017-18 (TR)
Carlton,Stockton-On-Tees,TS21 1EA (6 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 11 locations