Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Shovel Ready 4 Limited

4 unique locations (15 components)

Active MW: 128.12 MW
Inactive MW: 141.43 MW
Prince of Wales Energy Park Land off Skinner Lane Pontefract WF8 1HG (1 component)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (4 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Bevercotes Energy Park West Drayton Avenue Bevercotes Nottinghamshire DN22 8DB (2 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• The CMU component will consist of a single diesel engined generator installed close to the existing farm buildings at Milburn House farm. The generator will be located alongside a renewable energy scheme already with planning consent on the site.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Loading map...
Showing 4 locations