Shovel Ready 1 Limited

3 unique locations (42 components)

Active MW: 128.12 MW
Inactive MW: 141.43 MW
Frozen Foods Factory Supply, Whapload Primary substation, Rear of 203 Whapload Road, Lowestoft, Suffolk NR32 1XQ (15 components)
• 20MW of DSR
• 3.350 MW gas engine CHP plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land east of Corporation Road, Rochdale, OL11 4HJ (4 components)
• 10 x 2MW gas fuel generators to be installed in a compound on land east of Corporation Road.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (23 components)
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...