Sembcorp Utilities (UK) Limited

4 unique locations (47 components)

Active MW: 893.38 MW
Inactive MW: 1645.25 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (4 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4), 2026-27 (T-4)
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (27 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Active • 2023-24 (T-4)
Loading map...
Showing 4 locations