Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ScottishPower Energy Retail Limited

65 unique locations (292 components) - Page 1 of 3

Active MW: 71.28 MW
Inactive MW: 4208.18 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station) (2)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1/2 Factory Lane, Network House, Croydon, Surrey, CR9 3RA (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
26-30 Tottenham Rd, London, N1 4BZ (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
2 Samworth Way, Melton Mowbray LE13 1GA (9 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37 Boulton Road, Reading, Berksire, RG2 0NH (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
407-411 Century building, Brunswick Bus. Park, Liverpool, Merseyside, L3 4BJ (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
51 to 56 Farwig Lane, Beeline House, Bromley, Kent, BR1 3RE (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
63 to 69 Duke Street, Luton, Bedfordshire, LU2 0HH (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
700 Waterside Drive, Aztec West Almondsbury, Bristol, BS32 4ST (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
9 Greycaine Road, Watford, Watford, WD24 7GP (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
Admiral House, Level St, Brierley Hill, West Midlands, DY5 1XG (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
anchester Metroplex, 400 Broadway, Salford, Lancashire M5 5UE (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Brook Farm, Arncott, OX25 1NY (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Buttermilk Lane, Bolsover, S44 6AD (5 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (11 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Clayburn Rd, Grimethorpe, Barnsley S72 7BE (5 components)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Colindale CHP, Joslin Avenue, Barnet, London, NW9 5HW (12 components)

A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cranbrook CHP1, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered separately to the CHP
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Dukes Wood Lane, Pimbo, Lancashire, WN8 9QH. (1 component)

A new build 20MW gas fuelled generating station.

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations